The Early Production System (EPS) is a rapid program aimed at establishing minimal facilities prior to the installation of more expensive long-term facilities to achieve oil production from the Azar oil field in the shortest possible time. Sarvak Azar Company is responsible for the design, construction, installation, commissioning, and operation of the aforementioned facilities. The MEPS unit receives crude oil via tie-in from flowlines and delivers processed oil at the tie-in point to the export pipeline heading towards the Dehoran facilities.