The Oil and Gas Export Pipeline Project was executed in two stages: initial production and final production. This project included engineering, procurement, and construction (EPC) activities related to the transportation of crude oil, sweet crude oil, and sour gas from the Central Processing Facilities (CPF) to the production stations of Dehloran and Cheshmeh-Khosh. These activities include the construction of approximately 200 kilometers of Right of Way (ROW), a 16-inch sour crude oil pipeline stretching 130 kilometers, a seamless sour gas pipeline of 130 kilometers, and a 16-inch sweet crude oil pipeline covering 63 kilometers. The passages include roads and rivers, line break valves (LBVs), pig launchers and receivers, cathodic protection stations (CPS), their power supply lines, fiber optic cables along the pipeline, Supervisory Control and Data Acquisition (SCADA) system, Remote Terminal Unit (RTU), CCW, and HTD units.