Wednesday، 17 January 2024
 

Power Supply Project

This project includes the construction of a 132.11 kV power substation to supply the power required by Azar Oilfield.

Pictures
  • Power Supply Project
  • Power Supply Project
  • Power Supply Project
  • Power Supply Project
  • Power Supply Project
  • Power Supply Project
  • Power Supply Project