This project involves engineering, procurement, construction, and operation of a water pump station and an underground PE/GRVE water pipeline to transfer raw water from the Changule River to the Central Processing Facility (CPF) unit and operation of the Operator Permanent Residence Facility (OPRF) in the Azar oil field. The project includes the construction of a water intake and pumping station in the Changule River area, the installation of a 28.5-kilometer Right of Way (ROW), the installation of a Glass Reinforced Vinyl Ester (GRVE) water pipeline, construction of a raw water storage reservoir near the CPF, and a raw water storage basin in the well area for transferring raw water to the CPF via an 11-kilometer polyethylene pipeline.