According to the SARVAK AZAR public relations unit, per the significance of using modern technologies in the Azar oil field; The upstream deputy team with close cooperation and exchange of scientific and technological information with international companies; A new method called MPC (Multi-Stage Physico-Chemical) has been studied for the first time in Iran as one of the well-based methods for improving oil recovery and is currently being implemented in the Azar 17 well.
It should be noted that this method is based on the multi-stage injection of environmentally friendly chemicals and the performance of an exothermic chemical reaction inside the well, resulting in sediment loss and increased permeability of the reservoir rock. It also improves the hydrodynamic connection between the tank and the well, which improves and increases production.